The winter production of “The Foreigner” is moving into the final month. The set construction crew is working at breakneck speed to complete the set, the costumers are sewing and distressing and searching the vast reaches of the costume shop, and the cast of the show is learning their lines and working out the kinks in the blocking. Energy is high and everyone is looking ahead to opening night.